You've heard about it. Widen now with traffic circles and sewer pipe
replacement or leave for now and just replace sewer pipe.
Read the report here:
https://prescottaz.portal.civicclerk.co ... hment/6965
Report BACKGROUND
City Contract No. 2025-066
The report includes the evaluation and ranking of up to 15 alignment alternatives, including
preliminary design concepts for the three (3) highest ranked alternatives.
- 3B. Widening to five lanes, two new roundabouts and additional right-outs;
- 5B. Widening to five lanes with four lanes and a median barrier through The Narrows, two new roundabouts and additional right-outs; and,
- 2B. Current roadway with no additional lanes, two new roundabouts and additional right-outs.
Prescott Mayor-elect Cathey Rusing said she supports option 2B with modifications. (Aug 27, 2025)
The consultant's recommended option is 3B.

- Report Cover.png (56.88 KiB) Viewed 208 times
Go here for Granite Dells Images, maps and commentary: Dells_89.html
[attachment=2]89.jpg[/attachment]
[attachment=4]Dell_600w.png[/attachment]
[color=#00FFFF]Click here for 3 Aerial Map views at hi-res, to compare: [/color]https://prescottaz-blog.com/Dells_89.html
[attachment=0]section cut and 5B roundabout as traffic calming.jpg[/attachment]
[attachment=1]drilling_blsting-EXAMPLE_Image.jpg[/attachment]
You've heard about it. Widen now with traffic circles and sewer pipe
replacement or leave for now and just replace sewer pipe.
Read the report here: https://prescottaz.portal.civicclerk.com/event/1426/files/attachment/6965
Report BACKGROUND
City Contract No. 2025-066
The report includes the evaluation and ranking of up to 15 alignment alternatives, including
preliminary design concepts for the three (3) highest ranked alternatives.
- 3B. Widening to five lanes, two new roundabouts and additional right-outs;
- 5B. Widening to five lanes with four lanes and a median barrier through The Narrows, two new roundabouts and additional right-outs; and,
- 2B. Current roadway with no additional lanes, two new roundabouts and additional right-outs.
[color=#00FFFF]Prescott Mayor-elect Cathey Rusing said she supports option 2B with modifications. (Aug 27, 2025)
The consultant's recommended option is 3B.[/color]
[attachment=3]Report Cover.png[/attachment]
[color=#00FFFF]Go here for Granite Dells Images, maps and commentary:[/color] https://prescottaz-blog.com/Dells_89.html